1.
Huang J, Zhang T, Wei R. Urban Railway Transit Timetable Optimisation Based on Passenger-and-Trains Matching – A Case Study of Beijing Metro Line. Promet [Internet]. 2021Oct.8 [cited 2024Nov.21];33(5):671-87. Available from: https://traffic.fpz.hr/index.php/PROMTT/article/view/3736