[1]
Huang, J., Zhang, T. and Wei, R. 2021. Urban Railway Transit Timetable Optimisation Based on Passenger-and-Trains Matching – A Case Study of Beijing Metro Line. Promet - Traffic&Transportation. 33, 5 (Oct. 2021), 671-687. DOI:https://doi.org/10.7307/ptt.v33i5.3736.