[1]
Wang, Y.-G., Wei, G., Zhu, X. and Pei, Y.-L. 2011. Capacity of Bicycle Platoon Flow at Two-Phase Signalized Intersection: a Case Analysis of Xi’an City. Promet - Traffic&Transportation. 23, 3 (Jun. 2011), 177-186. DOI:https://doi.org/10.7307/ptt.v23i3.121.