1.
Huang J, Zhang T, Wei R. Urban Railway Transit Timetable Optimisation Based on Passenger-and-Trains Matching – A Case Study of Beijing Metro Line. Promet [Internet]. 2021Oct.8 [cited 2024Apr.28];33(5):671-87. Available from: http://traffic.fpz.hr/index.php/PROMTT/article/view/3736